|
Quality Control
Quality is the most crucial part of
our work. All work, before shipment, is subjected to thorough Quality
Control. Normally checks are conducted in 3 phases before they are
deemed ready to be despatched. Besides on screen checks, prints are
taken of all drawings for hard copy checks. The process of printing
and hard copy checks is repeated until we achieve the required level
of accuracy.
Any mistake attributable solely to Cadencesol will be rectified free
of cost for upto 2 years after the date of our submission.
We have developed rigorous internal Quality Procedures based on ISO
standards. |